| Quote: | |  | |
| Our kitchen was 32k
Then there was tiling
Demolishing an internal wall
Levelling floor
Over doubling the size of the terrace door with matching electric blind
2 new windows
1 new door
Lighting
Double check the offer includes all work - including the above if required | |
| | |
Yeah, this is what worries me!
I have a bunch of stuff I'll do myself, but it's always the labour costs that kills you here.
Fortunately our new layout isn't so different from the old one, except filling in a door (which I can do) and some extra sockets and better lights (ditto).
Tiling (splashbacks and floor), and skimming the walls, are probably the main labour costs in addition to the actual fitting.