Re: Dartford Crossing - toll payment changes from October 2014

Consultation is on for the proposed 3rd Thames Crossing.

"A new road linking Kent and Essex would almost double capacity across the River Thames, Highways England has said.

The route of the new road tunnel under the river would also almost halve the northbound crossing times at the Dartford Crossing, the agency said.

A 10-week public consultation on the latest designs for the Lower Thames Crossing has opened.

It is claimed the scheme will be the largest road upgrade project since the building of the M25.

The planned new 14.5 mile (23km) long three-lane dual carriageway would connect the M2 near Rochester and the M25 in Essex between North and South Ockendon and include a 2.4 mile (3.8km) tunnel between Gravesend and Tilbury."

https://www.bbc.com/news/uk-england-45799384

If you're in that area during the consultation period might be worth having a look. Unfortunately we've just missed it.