Those building poles and length of time before they build?

Does anyone know how long is the average time between those building poles going up and them actually starting to build?

We have an old building in front of us which today has had massive poles placed all over it, obviously I presume they want to start building in the summer which would be a major issue for us when we have just had new born twins.
Reply With Quote
  #2  
Old 14.03.2012, 19:23
Caviarchips's Avatar
Forum Legend
 
Join Date: May 2010
Location: Basel Stadt
Posts: 3,992
Groaned at 104 Times in 80 Posts
Thanked 6,677 Times in 2,388 Posts
Caviarchips has a reputation beyond reputeCaviarchips has a reputation beyond reputeCaviarchips has a reputation beyond reputeCaviarchips has a reputation beyond reputeCaviarchips has a reputation beyond reputeCaviarchips has a reputation beyond repute
Re: Those building poles and length of time before they build?

Can vary enormously.....there should be a sheet posted somewhere explaining something about the project and where to contact for details....

The major issue probably isn't the start date but that it will take freakin' ages to build whenever they start!
Reply With Quote
  #3  
Old 14.03.2012, 19:26
TiMow's Avatar
Forum Legend
 
Join Date: Dec 2010
Location: Fribourg
Posts: 9,302
Groaned at 237 Times in 154 Posts
Thanked 12,188 Times in 5,300 Posts
TiMow has a reputation beyond reputeTiMow has a reputation beyond reputeTiMow has a reputation beyond reputeTiMow has a reputation beyond reputeTiMow has a reputation beyond reputeTiMow has a reputation beyond repute
Re: Those building poles and length of time before they build?

It's a hard one to call because of a few variables.

It may vary from one Gemeinde to another.

The poles indicate the dimensions of the proposed building, and normally the plans are on view at the Gemeinde office, for about 2-3 wks, for anyone to oppose the development - but only if regulations are not adhered to, and not because someone just doesn't want it there.

If an opposition is made, this can put back the schedule, until plans are amended, and/or an agreement is made.

If there is no opposition, the things can start to happen quicker.

At this time of year, with no snow or frozen ground, I reckon a ball-park estimation of about a couple of months before the digger comes - although could go either way.

For a "normal" size family house, it could be up to a year of disruption.
Reply With Quote
This user would like to thank TiMow for this useful post:
  #4  
Old 14.03.2012, 19:27
Slaphead's Avatar
Forum Legend
 
Join Date: May 2007
Location: Zürich
Posts: 3,230
Groaned at 34 Times in 30 Posts
Thanked 9,408 Times in 2,870 Posts
Slaphead has a reputation beyond reputeSlaphead has a reputation beyond reputeSlaphead has a reputation beyond reputeSlaphead has a reputation beyond reputeSlaphead has a reputation beyond reputeSlaphead has a reputation beyond repute
Re: Those building poles and length of time before they build?

As far as I'm aware those poles are there to indicate to the general populus the dimensions of the proposed building, therefore enabling people to raise an objection. Or they possibly just tell the people how it will be.

In any event those poles will hang around for months, possibly even a year, before any building work takes place IME.
Reply With Quote
  #5  
Old 14.03.2012, 22:20
Forum Legend
 
Join Date: Oct 2009
Location: la cote
Posts: 3,411
Groaned at 21 Times in 13 Posts
Thanked 2,979 Times in 1,589 Posts
runningdeer has a reputation beyond reputerunningdeer has a reputation beyond reputerunningdeer has a reputation beyond reputerunningdeer has a reputation beyond reputerunningdeer has a reputation beyond repute
Re: Those building poles and length of time before they build?

You really cannot rely on the poles going up relating to any specific building timeframe. It can vary tremendously. In our village recently, there were poles that went up 3 times on the same plot of land over a 9 month timeframe, as apparently round 1 and round 2 got shot down by the commune for various reasons. If you are concerned, visit your commune and inquire. If directly effected you can put in an opposition to the build if with the the comment period.
Reply With Quote
  #6  
Old 14.03.2012, 22:24
Guest
 
Posts: n/a
Re: Those building poles and length of time before they build?

Plans for the proposed building should be posted in the entrance hall of the Gemeinde/Commune building. You should go to the Gemeinde Office and request to see plans if they are not posted there for perusal.
Reply With Quote
  #7  
Old 25.03.2019, 22:01
Newbie
 
Join Date: Feb 2019
Location: Zürich
Posts: 3
Groaned at 0 Times in 0 Posts
Thanked 0 Times in 0 Posts
swiss has no particular reputation at present
Re: Those building poles and length of time before they build?

Quote:
View Post
Does anyone know how long is the average time between those building poles going up and them actually starting to build
I have exactly same question as WelshBoyo had. Today those building poles were mounted at our apartment, I want to know by when I can expect the actual building work to start?
Reply With Quote
  #8  
Old 25.03.2019, 22:13
Blueangel's Avatar
Forum Legend
 
Join Date: Nov 2015
Location: Küsnacht, Switzerland
Posts: 3,889
Groaned at 105 Times in 96 Posts
Thanked 10,610 Times in 4,679 Posts
Blueangel has a reputation beyond reputeBlueangel has a reputation beyond reputeBlueangel has a reputation beyond reputeBlueangel has a reputation beyond reputeBlueangel has a reputation beyond reputeBlueangel has a reputation beyond repute
Re: Those building poles and length of time before they build?

Quote:
View Post
I have exactly same question as WelshBoyo had. Today those building poles were mounted at our apartment, I want to know by when I can expect the actual building work to start?
As long as it takes for all planning permissions to be granted and any legal challenges to be resolved. The poles for our planned balcony were standing for 2.5yrs that I know of.
Reply With Quote
  #9  
Old 26.03.2019, 05:06
Forum Veteran
 
Join Date: Aug 2011
Location: Risch
Posts: 726
Groaned at 35 Times in 21 Posts
Thanked 786 Times in 401 Posts
KiwiSteve has a reputation beyond reputeKiwiSteve has a reputation beyond reputeKiwiSteve has a reputation beyond reputeKiwiSteve has a reputation beyond repute
Re: Those building poles and length of time before they build?

Poles have been up opposite our place for the last eight years (approx, not sure anymore) and there are several nearby that have been there more than a year. Others in the neighborhood resulted in building within a few months. The gemeinde will know if there are objections.
Reply With Quote
  #10  
Old 26.03.2019, 10:23
xandeo's Avatar
Senior Member
 
Join Date: Dec 2011
Location: Top right corner
Posts: 339
Groaned at 28 Times in 20 Posts
Thanked 468 Times in 174 Posts
xandeo has an excellent reputationxandeo has an excellent reputationxandeo has an excellent reputationxandeo has an excellent reputation
Re: Those building poles and length of time before they build?

As already mentioned, it's down to if there is any opposition for the future building(s).

In our case, the poles for our house went up for 1 month (minimum time apparently), and once the month was over and we had 0 oppositions from our neighbors, we could start building in 4-5 months. The permits came rather easily even with 2 rounds of minor changes as the project evolved.

If you really want to make sure your twins have an easy first year at home, I'd oppose the building plans to win some time. Or move, if you were planning on doing it anyways (more space, perhaps?).
Reply With Quote
  #11  
Old 26.03.2019, 10:33
Guest
 
Posts: n/a
Re: Those building poles and length of time before they build?

Quote:
View Post
As already mentioned, it's down to if there is any opposition for the future building(s).

In our case, the poles for our house went up for 1 month (minimum time apparently), and once the month was over and we had 0 oppositions from our neighbors, we could start building in 4-5 months. The permits came rather easily even with 2 rounds of minor changes as the project evolved.

If you really want to make sure your twins have an easy first year at home, I'd oppose the building plans to win some time. Or move, if you were planning on doing it anyways (more space, perhaps?).

You can opose building plans without too many problems, however in order to avoid spurious opositions from whoever for whatever, many communes, if not all, now request that individual oposition comes with a Chf 500.-- deposit that is returned if the oposition is upheld.
Reply With Quote
The following 4 users would like to thank for this useful post:
  #12  
Old 11.04.2019, 12:22
Forum Legend
 
Join Date: May 2007
Location: Tessin
Posts: 6,331
Groaned at 124 Times in 91 Posts
Thanked 7,531 Times in 3,536 Posts
Mrs. Doolittle has a reputation beyond reputeMrs. Doolittle has a reputation beyond reputeMrs. Doolittle has a reputation beyond reputeMrs. Doolittle has a reputation beyond reputeMrs. Doolittle has a reputation beyond reputeMrs. Doolittle has a reputation beyond repute
Re: Those building poles and length of time before they build?

The poles must be in place before the building plans are submitted and if the plans are approved and a permit granted, the poles can be removed right away. How quickly this is done varies greatly and is not always an indication of when building will commence.
Reply With Quote
Reply

Tags
building poles




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Average length of time to get a job wedjul05 Employment 16 12.09.2011 15:59
length of time needed to exit tc90 Permits/visas/government 0 29.12.2009 11:08
Only a matter of time before they block EF for me at work.... pickles Daily life 27 11.12.2009 21:31
And did those feet in ancient time... gbn General off-topic 1 24.04.2008 19:44
Confused over permits [length of time allowed to seek work, EU] ManFromKent Permits/visas/government 2 26.02.2007 09:01


All times are GMT +2. The time now is 07:35.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
LinkBacks Enabled by vBSEO 3.1.0