Go Back   English Forum Switzerland > Help & tips > Housing in general  
 
Thread Tools Display Modes
Prev Previous Post   Next Post Next
  #1  
Old 14.03.2012, 19:15
WelshBoyo's Avatar
Member
 
Join Date: Mar 2007
Location: Zug
Posts: 153
Groaned at 0 Times in 0 Posts
Thanked 57 Times in 43 Posts
WelshBoyo has earned some respectWelshBoyo has earned some respect
Those building poles and length of time before they build?

Does anyone know how long is the average time between those building poles going up and them actually starting to build?

We have an old building in front of us which today has had massive poles placed all over it, obviously I presume they want to start building in the summer which would be a major issue for us when we have just had new born twins.
Reply With Quote
 

Tags
building poles




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Average length of time to get a job wedjul05 Employment 16 12.09.2011 15:59
length of time needed to exit tc90 Permits/visas/government 0 29.12.2009 11:08
Only a matter of time before they block EF for me at work.... pickles Daily life 27 11.12.2009 21:31
And did those feet in ancient time... gbn General off-topic 1 24.04.2008 19:44
Confused over permits [length of time allowed to seek work, EU] ManFromKent Permits/visas/government 2 26.02.2007 09:01


All times are GMT +2. The time now is 05:27.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2021, Jelsoft Enterprises Ltd.
LinkBacks Enabled by vBSEO 3.1.0