Re: Gotthard road tunnel closed indefinitely

Quote:
View Post
Wouldn't it make sense to change the title, now that the problem has been solved? Perhaps "Gotthard road tunnel open again".
Title edited to reflect the change in status of the tunnel.
Reply With Quote
The following 2 users would like to thank Belgianmum for this useful post:
  #42  
Old Yesterday, 11:28
Axa's Avatar
Axa Axa is offline
Forum Legend
 
Join Date: Oct 2019
Location: Suhr, Aargau
Posts: 5,919
Groaned at 114 Times in 103 Posts
Thanked 8,619 Times in 4,054 Posts
Axa has a reputation beyond reputeAxa has a reputation beyond reputeAxa has a reputation beyond reputeAxa has a reputation beyond reputeAxa has a reputation beyond reputeAxa has a reputation beyond repute
Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023]

Well, the issue might be related to the construction of the 2nd tunnel, so surprises ahead I picture in my head a few engineers nodding and saying "I told you so".

Quote:
Tunnels built too close to each other?

What remains the cause of the crack in the ceiling is stress redistribution in the mountain. According to the “Sonntagszeitung”, they could come from excavation work in the mountain. What may be crucial is that the tunnels were built too close to each other at the damage site. In addition, the second tube will be connected to the existing A2, which requires a certain proximity of the two tunnel tubes in the portal area.

Too little space in Göschenen and Airolo

Normally the safety distance is more than three times the diameter of the excavated tunnel. The tunnel diameter is 14 meters. A distance of 70 meters is therefore planned. At the point of damage, however, the distance is significantly smaller, says Rohrbach. The space conditions in neither Göschenen nor Airolo allow a large distance between the portal.
Changes to the construction process possible

It is expected that the cause of the crack in the ceiling will be clarified in the next few days. Apparently they don't want to change the route in order to reach the 70 meter distance earlier. However, tunnel construction expert Hansruedi Kreusen warns: “As long as the cause of the ceiling collapse is not clarified, the possible further risks for the road tunnel cannot be assessed. However, if the investigations show that stress shifts are the cause, further such events would have to be expected. A careful assessment of the risks is therefore necessary - changes to the construction process may be necessary.
https://www.pilatustoday.ch/zentrals...nnel-153829161
Reply With Quote
  #43  
Old Yesterday, 12:36
Tom1234's Avatar
Forum Legend
 
Join Date: Jan 2007
Location: Kanton Luzern
Posts: 18,903
Groaned at 840 Times in 655 Posts
Thanked 29,220 Times in 11,819 Posts
Tom1234 has a reputation beyond reputeTom1234 has a reputation beyond reputeTom1234 has a reputation beyond reputeTom1234 has a reputation beyond reputeTom1234 has a reputation beyond reputeTom1234 has a reputation beyond repute
Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023]

Quote:
View Post
Well, the issue might be related to the construction of the 2nd tunnel, so surprises ahead I picture in my head a few engineers nodding and saying "I told you so".
I'm surprised someone didn't write that the real "issue" was cyclists going through red lights...
Reply With Quote
This user groans at Tom1234 for this post:
  #44  
Old Yesterday, 12:42
Forum Legend
 
Join Date: Oct 2014
Location: Nyon
Posts: 8,569
Groaned at 540 Times in 399 Posts
Thanked 11,897 Times in 5,541 Posts
bowlie has a reputation beyond reputebowlie has a reputation beyond reputebowlie has a reputation beyond reputebowlie has a reputation beyond reputebowlie has a reputation beyond reputebowlie has a reputation beyond repute
Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023]

Quote:
View Post
Well, the issue might be related to the construction of the 2nd tunnel, so surprises ahead I picture in my head a few engineers nodding and saying "I told you so".



https://www.pilatustoday.ch/zentrals...nnel-153829161
There lots of dual tunnels with less than 70m. The Lotschberg and Gottard base tunnels for example.
Reply With Quote
  #45  
Old Yesterday, 13:05
Axa's Avatar
Axa Axa is offline
Forum Legend
 
Join Date: Oct 2019
Location: Suhr, Aargau
Posts: 5,919
Groaned at 114 Times in 103 Posts
Thanked 8,619 Times in 4,054 Posts
Axa has a reputation beyond reputeAxa has a reputation beyond reputeAxa has a reputation beyond reputeAxa has a reputation beyond reputeAxa has a reputation beyond reputeAxa has a reputation beyond repute
Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023]

Quote:
View Post
There lots of dual tunnels with less than 70m. The Lotschberg and Gottard base tunnels for example.
If I understood well it's a thumb rule about separation at least 3 times the diameter of the tunnels. 3*14 = 42m. At least 42m.

But, it's a thumb rule. Any heterogeneity in the rocks is reality, while the thumb rule is only a useless model of reality.
Reply With Quote
  #46  
Old Yesterday, 17:04
Forum Legend
 
Join Date: Oct 2014
Location: Nyon
Posts: 8,569
Groaned at 540 Times in 399 Posts
Thanked 11,897 Times in 5,541 Posts
bowlie has a reputation beyond reputebowlie has a reputation beyond reputebowlie has a reputation beyond reputebowlie has a reputation beyond reputebowlie has a reputation beyond reputebowlie has a reputation beyond repute
Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023]

Quote:
View Post
If I understood well it's a thumb rule about separation at least 3 times the diameter of the tunnels. 3*14 = 42m. At least 42m.

But, it's a thumb rule. Any heterogeneity in the rocks is reality, while the thumb rule is only a useless model of reality.
Good for hitchhiking.
Reply With Quote
Reply




Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are Off
Pingbacks are Off
Refbacks are Off


Similar Threads
Thread Thread Starter Forum Replies Last Post
Gotthard road tunnel closed by deadly crash Castro Swiss politics/news 2 13.12.2017 17:12
U.S 89 in Arizona closed indefinitely Guest International affairs/politics 15 01.04.2013 22:08
St Gotthard Tunnel tips please... bobo_97 Transportation/driving 8 01.06.2012 10:56
visit to Gotthard Tunnel Ski freek Travel/day trips/free time 29 22.02.2009 12:46
Gotthard tunnel (again) Zug bound Transportation/driving 7 11.07.2008 20:58


All times are GMT +2. The time now is 13:01.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2023, Jelsoft Enterprises Ltd.
LinkBacks Enabled by vBSEO 3.1.0