| | Re: Gotthard road tunnel closed indefinitely | Quote: | |  | | | Wouldn't it make sense to change the title, now that the problem has been solved? Perhaps "Gotthard road tunnel open again". | | | | | Title edited to reflect the change in status of the tunnel.
| The following 2 users would like to thank Belgianmum for this useful post: | | 
Yesterday, 11:28
|  | Forum Legend | | Join Date: Oct 2019 Location: Suhr, Aargau
Posts: 5,919
Groaned at 114 Times in 103 Posts
Thanked 8,619 Times in 4,054 Posts
| | Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023]
Well, the issue might be related to the construction of the 2nd tunnel, so surprises ahead  I picture in my head a few engineers nodding and saying "I told you so". | Quote: |  | | | Tunnels built too close to each other?
What remains the cause of the crack in the ceiling is stress redistribution in the mountain. According to the “Sonntagszeitung”, they could come from excavation work in the mountain. What may be crucial is that the tunnels were built too close to each other at the damage site. In addition, the second tube will be connected to the existing A2, which requires a certain proximity of the two tunnel tubes in the portal area. Too little space in Göschenen and Airolo
Normally the safety distance is more than three times the diameter of the excavated tunnel. The tunnel diameter is 14 meters. A distance of 70 meters is therefore planned. At the point of damage, however, the distance is significantly smaller, says Rohrbach. The space conditions in neither Göschenen nor Airolo allow a large distance between the portal.
Changes to the construction process possible
It is expected that the cause of the crack in the ceiling will be clarified in the next few days. Apparently they don't want to change the route in order to reach the 70 meter distance earlier. However, tunnel construction expert Hansruedi Kreusen warns: “As long as the cause of the ceiling collapse is not clarified, the possible further risks for the road tunnel cannot be assessed. However, if the investigations show that stress shifts are the cause, further such events would have to be expected. A careful assessment of the risks is therefore necessary - changes to the construction process may be necessary. | | | | | https://www.pilatustoday.ch/zentrals...nnel-153829161 | 
Yesterday, 12:36
|  | Forum Legend | | Join Date: Jan 2007 Location: Kanton Luzern
Posts: 18,903
Groaned at 840 Times in 655 Posts
Thanked 29,220 Times in 11,819 Posts
| | Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023] | Quote: | |  | | | Well, the issue might be related to the construction of the 2nd tunnel, so surprises ahead I picture in my head a few engineers nodding and saying "I told you so".
| | | | | I'm surprised someone didn't write that the real "issue" was cyclists going through red lights...
| This user groans at Tom1234 for this post: | | 
Yesterday, 12:42
| Forum Legend | | Join Date: Oct 2014 Location: Nyon
Posts: 8,570
Groaned at 540 Times in 399 Posts
Thanked 11,897 Times in 5,541 Posts
| | Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023] | Quote: | |  | | | | | | | | There lots of dual tunnels with less than 70m. The Lotschberg and Gottard base tunnels for example.
| 
Yesterday, 13:05
|  | Forum Legend | | Join Date: Oct 2019 Location: Suhr, Aargau
Posts: 5,919
Groaned at 114 Times in 103 Posts
Thanked 8,619 Times in 4,054 Posts
| | Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023] | Quote: | |  | | | There lots of dual tunnels with less than 70m. The Lotschberg and Gottard base tunnels for example. | | | | | If I understood well it's a thumb rule about separation at least 3 times the diameter of the tunnels. 3*14 = 42m. At least 42m.
But, it's a thumb rule. Any heterogeneity in the rocks is reality, while the thumb rule is only a useless model of reality.
| 
Yesterday, 17:04
| Forum Legend | | Join Date: Oct 2014 Location: Nyon
Posts: 8,570
Groaned at 540 Times in 399 Posts
Thanked 11,897 Times in 5,541 Posts
| | Re: Gotthard road tunnel closed indefinitely [reopened 15/09/2023] | Quote: | |  | | | If I understood well it's a thumb rule about separation at least 3 times the diameter of the tunnels. 3*14 = 42m. At least 42m.
But, it's a thumb rule. Any heterogeneity in the rocks is reality, while the thumb rule is only a useless model of reality. | | | | | Good for hitchhiking.
|